Whether it's a Glenferrie Road apartment basement or a period home with a detached garage down a long driveway, we run the cable the right way and get you charging.
Whether it's a Glenferrie Road apartment basement or a period home with a detached garage down a long driveway, we run the cable the right way and get you charging.

Trusted brands
Period homes fill Hawthorn and Kew, and in many of them the garage came much later than the house — typically detached, at the back of a long side driveway, a long way from the front-wall meter box. On every quote here we work out that distance first, as it sets the cable size, the conduit route, and whether we core through brick or run neatly along a fence line.
Setbacks in Kew are often even bigger, so cable runs get longer again, occasionally 20 to 30 metres between the switchboard and the garage. The route is planned before any tools come out, so the result looks deliberate instead of like something stapled to the fascia as an afterthought.
Nearer Glenferrie Road, many owners live in apartment blocks with rear or basement parking bays. That's another kind of job entirely — shared switchboards, sign-off from the owners corporation, and at times a dedicated sub-circuit run through the riser down to the bay allocated to you.
In short
Electric Electrician fits EV chargers throughout Kew and Hawthorn, from long cable runs out to detached rear garages to basement bays under Glenferrie Road apartments. We hold an A-Grade licence, give a fixed price before work begins, and you receive a Certificate of Electrical Safety when it's done. Call 0468 515 481.
Detached rear garages around here were mostly built for one car, decades before EVs, so a spare circuit is rarely waiting there. A dedicated 32A circuit with an RCBO goes in from the main switchboard, in conduit run under the eaves or beside the driveway boundary, ending at a wall-mounted 7kW charger inside the garage or next to it.
Over Kew's longer setbacks, voltage drop and cable size become genuine issues, so we size the cable for the actual run instead of falling back on a standard spec. If the driveway is shared or the front fence is under a heritage overlay, the conduit is routed so it stays discreet from the street.
For Glenferrie Road apartment buildings, we liaise with the owners corporation and run from your own meter or a common switchboard to your bay in the basement, keeping the cable tidy beside the services already fixed to the car park ceiling.
Lots of period homes in Hawthorn still run older switchboards that a kitchen or bathroom renovation left untouched. Before quoting the charger we check the earthing and main switch rating, and look for ceramic fuse gear that would need replacing so a dedicated 32A circuit can be added safely.
If supply is tight or the home already has ducted heating and cooling, load management can share capacity instead of forcing a full upgrade. Where a bigger Kew home has three-phase supply, 11kW or 22kW charging suits it well, should you want quicker overnight top-ups.
How it works
Skip the endless emails, the quote chasing and the dodgy pricing. Get in touch today, receive a clear fixed price quickly, and a licensed electrician can often be at your place that same week.

Call, message or use the online form in two minutes. Say what needs doing, or what's wrong, and we'll reply promptly.
After an inspection, you get one clear all-inclusive price before work begins. The quoted figure is what you pay, with no unexpected extras.
A licensed A-Grade electrician carries out your job to AS/NZS 3000, tests each circuit and leaves your home tidier than before.
On install day we isolate supply, run the circuit and terminate it, then mount the charger and test it all to AS/NZS 3000 before handover. You'll get a Certificate of Electrical Safety, which insurance and any strata records will require.
Off-peak scheduling is a common question from Hawthorn and Kew customers, and with solar on the roof we can configure an OCPP-compatible charger to prefer daytime charging while the panels are generating.
Not for us, though it changes the job. Our first step is measuring the run, then the cable is sized so voltage doesn't drop over the distance, which comes up often on Kew's bigger blocks. You might need a slightly larger cable or another route compared with a standard install, but the end result works exactly as intended.
Yes, but the owners corporation has to approve it first, as the cable normally crosses common property on its way to your basement bay. We can give your OC the technical information it needs for sign-off, and after that the circuit is run from an agreed common supply point or your own meter.
Where three-phase supply is already there, an 11-22kW charger tops up an EV considerably quicker overnight than a 7kW unit. You don't need it, but on larger properties with switchboard room, it's a sensible upgrade to look at while we're on site.
We'll point it out when quoting. Rewireable ceramic fuses aren't suitable protection for a newly added EV circuit, so as part of the job we'd swap the relevant fuse ways for RCBOs. It's a simple extra and shouldn't hold up the install.