Is your basement bay far from the meter? We plan the cable route, get the owners corporation to sign off and have your CBD apartment charging.
Is your basement bay far from the meter? We plan the cable route, get the owners corporation to sign off and have your CBD apartment charging.

Trusted brands
In the Melbourne CBD, most people live in a tower apartment and park in an allocated bay in the shared basement, frequently two or three levels below ground and well away from the residential meter room. For EV charger installation here, everything comes down to that distance and to the common property you share with hundreds of other owners.
Most of our call-outs come from towers in Southbank and Docklands, and each area has its quirks. Basements in Southbank buildings usually have less headroom between floor and ceiling, plus shared switchrooms, whereas many Docklands towers went up with EV-ready conduit for the future that nobody has ever actually connected.
Before quoting any CBD job, we find out who the building manager is and whether there's an EV policy in place already. Some owners corporations follow a set process for works on common property, while others have never been asked and need it all explained from the start. We deal with both regularly.
In short
In Melbourne CBD apartment towers, Southbank and Docklands included, Electric Electrician installs EV chargers and takes care of the paperwork for the owners corporation, plus sub-metering and liaising with the building manager, as basement car park jobs require. We hold an A-Grade licence, agree a fixed price before starting and issue a CES once the work is complete.
Most CBD towers keep residential meters in one central room, which can be an entire building away from where you park. A dedicated circuit has to pass through shared plant areas, basement risers and fire-rated penetrations, and the building manager has to approve all of it, not only you.
Instead of estimating from a floor plan, we measure the real route on site, since years of fit-outs and extra services mean basement car parks seldom match the original drawings. From that visit we work out cable size, the conduit path and whether after-hours access is needed to avoid building traffic.
Newer CBD buildings do sometimes have EV-ready infrastructure on common property, but in many older towers the shared supply to the car park levels has little capacity to spare. Before suggesting a charger, we look at how much capacity the basement plant room switchboard has, and where supply is short we specify load management, which makes your charger automatically draw less when the shared circuit is busy.
Where the building charges owners for shared power, we can add sub-metering so your charging is recorded on its own and billed fairly, instead of being rolled into the common property account.
How it works
Skip the endless emails, the quote chasing and the dodgy pricing. Get in touch today, receive a clear fixed price quickly, and a licensed electrician can often be at your place that same week.

Call, message or use the online form in two minutes. Say what needs doing, or what's wrong, and we'll reply promptly.
After an inspection, you get one clear all-inclusive price before work begins. The quoted figure is what you pay, with no unexpected extras.
A licensed A-Grade electrician carries out your job to AS/NZS 3000, tests each circuit and leaves your home tidier than before.
Since the work is on common property, we schedule a time that works for the building manager, often avoiding peak hours for the lifts and loading dock. We only isolate what has to be isolated, take the dedicated 32A circuit and its RCBO through to the switchroom, then fix the charger in your bay, protecting the cable along the route traffic actually takes.
Most residents would like a smart charger that can be scheduled from their phone, especially so it charges overnight on cheaper rates instead of in the daytime. We configure it during the install, so it's ready the moment we sign off.
In nearly every case, yes, since the cable has to cross common property to get from the switchroom to your bay. We put together the technical information your manager or committee will want, such as the cable route, switchboard capacity and load impact, so approval goes through quicker than if a resident tried to explain it on their own.
It depends; sometimes it's fine, and sometimes load management is needed. Before quoting, we check the switchboard that feeds your car park level. Where spare capacity is limited, dynamic load management means your charger can safely share the circuit with other loads, avoiding the trigger for a costly supply upgrade.
Once access is booked, most CBD installs take a full day, mainly because of the long cable run from the meter room down to a basement bay, plus the coordination required with the building manager. Simple bays on the ground floor or podium can occasionally be done faster.
Sub-metering can be fitted to measure your EV charging separately from common property power, which most owners corporations favour as it's fairer between residents. If the building has no billing method set up yet, it's a good idea to bring it up with your committee before the install.