Interwar homes in Camberwell and Malvern now carry loads the original boards were never designed for. We install a switchboard that copes instead of tripping.
Interwar homes in Camberwell and Malvern now carry loads the original boards were never designed for. We install a switchboard that copes instead of tripping.

Trusted brands
Solid interwar family homes fill Camberwell and Malvern: big rooms, a garage now used as a home gym, and a hidden switchboard still doing what it did back in the 1930s. That gap comes up all the time. A board designed for a wireless, a stove and a handful of lights is now expected to run pool equipment, a hydronic heating pump, double ovens, induction cooktops and ducted refrigerated cooling.
Properties around Burke Road and Glen Iris especially tend to be renovated bit by bit over many years, so circuits often get added ad hoc across decades while nobody reassesses the consumer mains or main switch against the total load.
With two EVs charging overnight on an Ashburton driveway, it's easy to see why these boards trip each summer, when the pool pump, oven and air conditioning all hit the same circuit together.
In short
Every week Electric Electrician upgrades switchboards in the large interwar homes of Camberwell and Malvern, sizing each new board for induction cooking, ducted cooling, EV charging and pool equipment. You get a fixed written quote, we're fully insured, and we issue a CES once the work is complete. Call 0468 515 481.
In this pocket, most interwar boards were sized for a small fraction of the appliance load homes carry now. Even where a safety switch was added by an earlier owner, it's often one RCD covering the entire house instead of RCBOs on each circuit, so a single fault trips everything rather than only the affected part.
Consumer mains designed for 1930s demand turn into the bottleneck as well. Adding RCBOs won't help if the mains feeding the house aren't rated for today's draw; under heavy load you'll still get voltage drop and nuisance tripping.
First we assess the household's real load, including cooking appliances, ducted cooling, the hydronic pump, pool equipment and EV chargers, then size the main switch and consumer mains to match rather than to a generic standard.
Next comes a new switchboard with individual-circuit RCBOs and a compliant meter panel. If the supply also needs upgrading to carry more capacity, as often happens in older Ashburton and Glen Iris streets, we coordinate that with the distributor.
How it works
Skip the endless emails, the quote chasing and the dodgy pricing. Get in touch today, receive a clear fixed price quickly, and a licensed electrician can often be at your place that same week.

Call, message or use the online form in two minutes. Say what needs doing, or what's wrong, and we'll reply promptly.
After an inspection, you get one clear all-inclusive price before work begins. The quoted figure is what you pay, with no unexpected extras.
A licensed A-Grade electrician carries out your job to AS/NZS 3000, tests each circuit and leaves your home tidier than before.
When the safety switch trips every time the oven and air conditioning run at once, or a second EV charger keeps being flagged as an issue, your board is saying it has reached its limit.
A switchboard sized properly takes that limit away. It separates a Camberwell family that keeps resetting the safety switch halfway through dinner from one running pool gear, cooking, cooling and two EVs without thinking about it.
In summer the load stacks up: air conditioning running nonstop, pool pumps, and fridges working harder, all on top of normal circuits. When an interwar home's consumer mains and board were sized decades back, that combined demand exceeds what undersized mains and a single RCD can manage, so it keeps tripping until a properly sized upgrade fixes it.
That comes down to how much capacity your current supply has, and we check it before recommending anything. In plenty of Camberwell and Malvern homes the answer is either a supply upgrade or load management that shares the available capacity across both chargers so together they stay within the limit of the mains. We size this correctly rather than taking a guess.
Frequently, yes, especially in Ashburton and Glen Iris homes where the pool pump, garage and outdoor entertaining area are some distance from the main board. A dedicated sub-board, with RCBOs of its own, gives those circuits proper protection and makes later additions, such as EV charging in the garage, much simpler.
Most switchboard upgrades in Camberwell and Malvern are finished in one day, with the power off for a set window while the new board is installed. Where possible we work around your household and confirm the timing beforehand, so you can plan around pets, cooking and school pickups.