Many Toorak period estates run three-phase power out to several sub-boards, and we upgrade all of it properly, protecting heritage detail and handling the paperwork.
Many Toorak period estates run three-phase power out to several sub-boards, and we upgrade all of it properly, protecting heritage detail and handling the paperwork.

Trusted brands
A Toorak property seldom has just one switchboard to deal with. Many larger estates and period homes around Heyington, Kooyong Road and Grange Road are on three-phase supply, which feeds the main house plus separate sub-boards serving a pool house, a garage or a self-contained wing.
Those sub-boards were normally installed at different times, by different electricians, for different reasons, so the whole system can be inconsistent even if each board looks fine by itself. Factor in joinery, ornate plasterwork and heritage cornices that owners understandably want left alone, and a switchboard job in Toorak calls for more planning than a typical suburban upgrade.
Apartments in Hawksburn present a problem on a different scale, but a connected one: older buildings whose meter panels and boards have fallen behind the appliance loads today's owners expect.
In short
Electric Electrician upgrades switchboards in Hawksburn apartments and on Toorak's large period estates, covering three-phase supplies and the multiple sub-boards that serve wings, garages and pool houses. The price is fixed and agreed in writing, and heritage plaster and cornices are protected throughout the job. Phone 0468 515 481.
When three-phase supply feeds a main switchboard and a number of sub-boards, each board has to be assessed both individually and for how load is spread across the phases. If one phase is heavily loaded while another is hardly used, performance becomes uneven and equipment wears faster than it should.
Before we touch anything, we map the electrical layout of the entire property — main board, garage, pool house and wing sub-boards — so the upgrade balances load correctly and lifts every board to one standard instead of fixing a single board on its own.
In Toorak period homes, the switchboard is often positioned among cornices, ornate plaster ceilings or original joinery that owners want left entirely alone. We plan panel positions and cable runs specifically to steer clear of these wherever practical.
Sub-boards that serve a garage or pool house instead of the main residence usually give us much more flexibility, and if it means less disruption in the main house, we do that work first.
How it works
Skip the endless emails, the quote chasing and the dodgy pricing. Get in touch today, receive a clear fixed price quickly, and a licensed electrician can often be at your place that same week.

Call, message or use the online form in two minutes. Say what needs doing, or what's wrong, and we'll reply promptly.
After an inspection, you get one clear all-inclusive price before work begins. The quoted figure is what you pay, with no unexpected extras.
A licensed A-Grade electrician carries out your job to AS/NZS 3000, tests each circuit and leaves your home tidier than before.
In Hawksburn, apartment switchboards are usually single-phase and a smaller job than a Toorak estate, yet many still rely on original meter panels that nobody has reassessed since construction.
With apartments, we focus on fitting a compliant meter panel and RCBOs so each unit's board meets the standard, and on working with the owners corporation wherever shared infrastructure is affected.
Not necessarily. We can set priorities by safety and condition, starting with the main switchboard and whichever sub-board shows the most worrying signs, then moving on to the rest. On a property with full three-phase supply, you'll get a clear order of work and a separate fixed price per stage so you can plan ahead.
Before starting, we work out panel placement and cable routes specifically so original plaster detail isn't cut. If the current switchboard position makes that hard, we'll discuss other positions that still satisfy access and compliance requirements while keeping the impact on heritage features to a minimum.
Three-phase supply spreads load over three power lines rather than one, which suits big properties running heavy equipment such as ducted systems, pool plant and several sub-boards. When we upgrade a switchboard on three-phase, the job is to spread the load evenly over the three phases, so none is overworked while another sits unused.
Generally, work on your unit's own switchboard and internal circuits can go ahead without owners corporation sign-off, whereas anything involving the point of attachment, risers or shared meter panels usually needs it. Before we start, we sort your job into the parts that need sign-off and the parts that don't.